BGB Worm gearboxes with IEC input flange and input shaft

BERNATI worm gearboxes are a high quality, modular solution for transforming power in the

required format (speed and torque) to drive any application.

All components use high quality materials:

  • Worm gear in hardened, alloy steel case;
  • Worm wheel in high resistance bronze;
  • Optimized gear profile for low noise operation;
  • Exterior housing in die cast aluminum, up to size 090;
  • Exterior housing in cast iron, for sizes 110 to 150;
  • BG range with epoxy painting in RAL 9006;
  • Housing designed for versatile assembly and efficient heat dissipation;
  • Long life and high reliability of bearings and seals;
  • Sizes 025 to 090 and pre-stages are lubricated for life with synthetic lubricant in the ideal quantity to allow a universal mounting position;
  • Sizes 110 to 150 are lubricated with mineral oil, in a quantity adequate for B3 assembly position and require a simple maintenance plan.
  • The BG series has a square format that allows fixing in any position.

BGB Type - Input IEC flange and solid worm gear shaft configuration.

SKU Size Gear ratio Version Input Configuration PAM Shipped In Price *
BGB75FA25805 75 25 FA IEC PAM + Input Shaft 80B5 4-5 Days €271.29
BGB75FB25805 75 25 FB IEC PAM + Input Shaft 80B5 4-5 Days €277.09
BGB110100905 110 100 U IEC PAM + Input Shaft 90B5 4-5 Days €540.86
BGB1101010014 110 10 U IEC PAM + Input Shaft 110/112B14 4-5 Days €540.86
BGB110101005 110 10 U IEC PAM + Input Shaft 110/112B5 4-5 Days €540.86
BGB1101013214 110 10 U IEC PAM + Input Shaft 132B14 4-5 Days €540.86
BGB110101325 110 10 U IEC PAM + Input Shaft 132B5 4-5 Days €540.86
BGB1101510014 110 15 U IEC PAM + Input Shaft 110/112B14 4-5 Days €540.86
BGB110151125 110 15 U IEC PAM + Input Shaft 110/112B5 4-5 Days €540.86
BGB1101513214 110 15 U IEC PAM + Input Shaft 132B14 4-5 Days €540.86
BGB110151325 110 15 U IEC PAM + Input Shaft 132B5 4-5 Days €540.86
BGB1102010014 110 20 U IEC PAM + Input Shaft 110/112B14 4-5 Days €540.86
BGB110201005 110 20 U IEC PAM + Input Shaft 110/112B5 4-5 Days €540.86
BGB1102013214 110 20 U IEC PAM + Input Shaft 132B14 4-5 Days €540.86
BGB110201325 110 20 U IEC PAM + Input Shaft 132B5 4-5 Days €540.86
BGB1102510014 110 25 U IEC PAM + Input Shaft 110/112B14 4-5 Days €540.86
BGB110251005 110 25 U IEC PAM + Input Shaft 110/112B5 4-5 Days €540.86
BGB1103010014 110 30 U IEC PAM + Input Shaft 110/112B14 4-5 Days €540.86
BGB110301005 110 30 U IEC PAM + Input Shaft 110/112B5 4-5 Days €540.86
BGB1104010014 110 40 U IEC PAM + Input Shaft 110/112B14 4-5 Days €540.86
BGB110401005 110 40 U IEC PAM + Input Shaft 110/112B5 4-5 Days €540.86
BGB11040905 110 40 U IEC PAM + Input Shaft 90B5 4-5 Days €540.86
BGB1105010014 110 50 U IEC PAM + Input Shaft 110/112B14 4-5 Days €540.86
BGB110501005 110 50 U IEC PAM + Input Shaft 110/112B5 4-5 Days €540.86
BGB11050905 110 50 U IEC PAM + Input Shaft 90B5 4-5 Days €540.86
BGB1106010014 110 60 U IEC PAM + Input Shaft 110/112B14 4-5 Days €540.86
BGB110601005 110 60 U IEC PAM + Input Shaft 110/112B5 4-5 Days €540.86
BGB11060905 110 60 U IEC PAM + Input Shaft 90B5 4-5 Days €540.86
BGB1107.510014 110 7.5 U IEC PAM + Input Shaft 110/112B14 4-5 Days €540.86
BGB1107.51005 110 7.5 U IEC PAM + Input Shaft 110/112B5 4-5 Days €540.86
BGB1107.513214 110 7.5 U IEC PAM + Input Shaft 132B14 4-5 Days €540.86
BGB1107.51325 110 7.5 U IEC PAM + Input Shaft 132B5 4-5 Days €540.86
BGB11080905 110 80 U IEC PAM + Input Shaft 90B5 4-5 Days €540.86
BGB110FA100905 110 100 FA IEC PAM + Input Shaft 90B5 4-5 Days €598.14
BGB110FA1010014 110 10 FA IEC PAM + Input Shaft 110/112B14 4-5 Days €598.14
BGB110FA101005 110 10 FA IEC PAM + Input Shaft 110/112B5 4-5 Days €598.14
BGB110FA1013214 110 10 FA IEC PAM + Input Shaft 132B14 4-5 Days €598.14
BGB110FA101325 110 10 FA IEC PAM + Input Shaft 132B5 4-5 Days €598.14
BGB110FA1510014 110 15 FA IEC PAM + Input Shaft 110/112B14 4-5 Days €598.14
BGB110FA151125 110 15 FA IEC PAM + Input Shaft 110/112B5 4-5 Days €598.14
BGB110FA1513214 110 15 FA IEC PAM + Input Shaft 132B14 4-5 Days €598.14
BGB110FA151325 110 15 FA IEC PAM + Input Shaft 132B5 4-5 Days €598.14
BGB110FA2010014 110 20 FA IEC PAM + Input Shaft 110/112B14 4-5 Days €598.14
BGB110FA201005 110 20 FA IEC PAM + Input Shaft 110/112B5 4-5 Days €598.14
BGB110FA2013214 110 20 FA IEC PAM + Input Shaft 132B14 4-5 Days €598.14
BGB110FA201325 110 20 FA IEC PAM + Input Shaft 132B5 4-5 Days €598.14
BGB110FA2510014 110 25 FA IEC PAM + Input Shaft 110/112B14 4-5 Days €598.14
BGB110FA251005 110 25 FA IEC PAM + Input Shaft 110/112B5 4-5 Days €598.14
BGB110FA3010014 110 30 FA IEC PAM + Input Shaft 110/112B14 4-5 Days €598.14
BGB110FA301005 110 30 FA IEC PAM + Input Shaft 110/112B5 4-5 Days €598.14
BGB110FA4010014 110 40 FA IEC PAM + Input Shaft 110/112B14 4-5 Days €598.14
BGB110FA401005 110 40 FA IEC PAM + Input Shaft 110/112B5 4-5 Days €598.14
BGB110FA40905 110 40 FA IEC PAM + Input Shaft 90B5 4-5 Days €598.14
BGB110FA5010014 110 50 FA IEC PAM + Input Shaft 110/112B14 4-5 Days €598.14
BGB110FA501005 110 50 FA IEC PAM + Input Shaft 110/112B5 4-5 Days €598.14
BGB110FA50905 110 50 FA IEC PAM + Input Shaft 90B5 4-5 Days €598.14
BGB110FA6010014 110 60 FA IEC PAM + Input Shaft 110/112B14 4-5 Days €598.14
BGB110FA601005 110 60 FA IEC PAM + Input Shaft 110/112B5 4-5 Days €598.14
BGB110FA60905 110 60 FA IEC PAM + Input Shaft 90B5 4-5 Days €598.14
BGB110FA7.510014 110 7.5 FA IEC PAM + Input Shaft 110/112B14 4-5 Days €598.14
BGB110FA7.51005 110 7.5 FA IEC PAM + Input Shaft 110/112B5 4-5 Days €598.14
BGB110FA7.513214 110 7.5 FA IEC PAM + Input Shaft 132B14 4-5 Days €598.14
BGB110FA7.51325 110 7.5 FA IEC PAM + Input Shaft 132B5 4-5 Days €598.14
BGB110FA80905 110 80 FA IEC PAM + Input Shaft 90B5 4-5 Days €598.14
BGB110FB100905 110 100 FB IEC PAM + Input Shaft 90B5 4-5 Days €616.59
BGB110FB1010014 110 10 FB IEC PAM + Input Shaft 110/112B14 4-5 Days €616.59
BGB110FB101005 110 10 FB IEC PAM + Input Shaft 110/112B5 4-5 Days €616.59
BGB110FB1013214 110 10 FB IEC PAM + Input Shaft 132B14 4-5 Days €616.59
BGB110FB101325 110 10 FB IEC PAM + Input Shaft 132B5 4-5 Days €616.59
BGB110FB1510014 110 15 FB IEC PAM + Input Shaft 110/112B14 4-5 Days €616.59
BGB110FB151125 110 15 FB IEC PAM + Input Shaft 110/112B5 4-5 Days €616.59
BGB110FB1513214 110 15 FB IEC PAM + Input Shaft 132B14 4-5 Days €616.59
BGB110FB151325 110 15 FB IEC PAM + Input Shaft 132B5 4-5 Days €616.59
BGB110FB2010014 110 20 FB IEC PAM + Input Shaft 110/112B14 4-5 Days €616.59
BGB110FB201005 110 20 FB IEC PAM + Input Shaft 110/112B5 4-5 Days €616.59
BGB110FB2013214 110 20 FB IEC PAM + Input Shaft 132B14 4-5 Days €616.59
BGB110FB201325 110 20 FB IEC PAM + Input Shaft 132B5 4-5 Days €616.59
BGB110FB2510014 110 25 FB IEC PAM + Input Shaft 110/112B14 4-5 Days €616.59
BGB110FB251005 110 25 FB IEC PAM + Input Shaft 110/112B5 4-5 Days €616.59
BGB110FB3010014 110 30 FB IEC PAM + Input Shaft 110/112B14 4-5 Days €616.59
BGB110FB301005 110 30 FB IEC PAM + Input Shaft 110/112B5 4-5 Days €616.59
BGB110FB4010014 110 40 FB IEC PAM + Input Shaft 110/112B14 4-5 Days €616.59
BGB110FB401005 110 40 FB IEC PAM + Input Shaft 110/112B5 4-5 Days €616.59
BGB110FB40905 110 40 FB IEC PAM + Input Shaft 90B5 4-5 Days €616.59
BGB110FB5010014 110 50 FB IEC PAM + Input Shaft 110/112B14 4-5 Days €616.59
BGB110FB501005 110 50 FB IEC PAM + Input Shaft 110/112B5 4-5 Days €616.59
BGB110FB50905 110 50 FB IEC PAM + Input Shaft 90B5 4-5 Days €616.59
BGB110FB6010014 110 60 FB IEC PAM + Input Shaft 110/112B14 4-5 Days €616.59
BGB110FB601005 110 60 FB IEC PAM + Input Shaft 110/112B5 4-5 Days €616.59
BGB110FB60905 110 60 FB IEC PAM + Input Shaft 90B5 4-5 Days €616.59
BGB110FB7.510014 110 7.5 FB IEC PAM + Input Shaft 110/112B14 4-5 Days €616.59
BGB110FB7.51005 110 7.5 FB IEC PAM + Input Shaft 110/112B5 4-5 Days €616.59
BGB110FB7.513214 110 7.5 FB IEC PAM + Input Shaft 132B14 4-5 Days €616.59
BGB110FB7.51325 110 7.5 FB IEC PAM + Input Shaft 132B5 4-5 Days €616.59
BGB110FB80905 110 80 FB IEC PAM + Input Shaft 90B5 4-5 Days €616.59
BGB13010010014 130 100 U IEC PAM + Input Shaft 110/112B14 4-5 Days €717.22
BGB1301001005 130 100 U IEC PAM + Input Shaft 110/112B5 4-5 Days €717.22
BGB130100905 130 100 U IEC PAM + Input Shaft 90B5 4-5 Days €717.22
BGB1301013214 130 10 U IEC PAM + Input Shaft 132B14 4-5 Days €717.22
BGB130101325 130 10 U IEC PAM + Input Shaft 132B5 4-5 Days €717.22
BGB1301513214 130 15 U IEC PAM + Input Shaft 132B14 4-5 Days €717.22
BGB130151325 130 15 U IEC PAM + Input Shaft 132B5 4-5 Days €717.22
BGB1302013214 130 20 U IEC PAM + Input Shaft 132B14 4-5 Days €717.22
BGB130201325 130 20 U IEC PAM + Input Shaft 132B5 4-5 Days €717.22
BGB1302513214 130 25 U IEC PAM + Input Shaft 132B14 4-5 Days €717.22
BGB130251325 130 25 U IEC PAM + Input Shaft 132B5 4-5 Days €717.22
BGB1303010014 130 30 U IEC PAM + Input Shaft 110/112B14 4-5 Days €717.22
BGB130301005 130 30 U IEC PAM + Input Shaft 110/112B5 4-5 Days €717.22
BGB1303013214 130 30 U IEC PAM + Input Shaft 132B14 4-5 Days €717.22
BGB130301325 130 30 U IEC PAM + Input Shaft 132B5 4-5 Days €717.22
BGB1304010014 130 40 U IEC PAM + Input Shaft 110/112B14 4-5 Days €717.22
BGB130401005 130 40 U IEC PAM + Input Shaft 110/112B5 4-5 Days €717.22
BGB1304013214 130 40 U IEC PAM + Input Shaft 132B14 4-5 Days €717.22
BGB130401325 130 40 U IEC PAM + Input Shaft 132B5 4-5 Days €717.22
BGB1305010014 130 50 U IEC PAM + Input Shaft 110/112B14 4-5 Days €717.22
BGB130501005 130 50 U IEC PAM + Input Shaft 110/112B5 4-5 Days €717.22
BGB1306010014 130 60 U IEC PAM + Input Shaft 110/112B14 4-5 Days €717.22
BGB130601005 130 60 U IEC PAM + Input Shaft 110/112B5 4-5 Days €717.22
BGB1307.513214 130 7.5 U IEC PAM + Input Shaft 132B14 4-5 Days €717.22
BGB1307.51325 130 7.5 U IEC PAM + Input Shaft 132B5 4-5 Days €717.22
BGB1308010014 130 80 U IEC PAM + Input Shaft 110/112B14 4-5 Days €717.22
BGB130801005 130 80 U IEC PAM + Input Shaft 110/112B5 4-5 Days €717.22
BGB13080905 130 80 U IEC PAM + Input Shaft 90B5 4-5 Days €717.22
BGB130FA10010014 130 100 FA IEC PAM + Input Shaft 110/112B14 4-5 Days €793.39
BGB130FA1001005 130 100 FA IEC PAM + Input Shaft 110/112B5 4-5 Days €793.39
BGB130FA100905 130 100 FA IEC PAM + Input Shaft 90B5 4-5 Days €793.39
BGB130FA1013214 130 10 FA IEC PAM + Input Shaft 132B14 4-5 Days €793.39
BGB130FA101325 130 10 FA IEC PAM + Input Shaft 132B5 4-5 Days €793.39
BGB130FA1513214 130 15 FA IEC PAM + Input Shaft 132B14 4-5 Days €793.39
BGB130FA151325 130 15 FA IEC PAM + Input Shaft 132B5 4-5 Days €793.39
BGB130FA2013214 130 20 FA IEC PAM + Input Shaft 132B14 4-5 Days €793.39
BGB130FA201325 130 20 FA IEC PAM + Input Shaft 132B5 4-5 Days €793.39
BGB130FA2513214 130 25 FA IEC PAM + Input Shaft 132B14 4-5 Days €793.39
BGB130FA251325 130 25 FA IEC PAM + Input Shaft 132B5 4-5 Days €793.39
BGB130FA3010014 130 30 FA IEC PAM + Input Shaft 110/112B14 4-5 Days €793.39
BGB130FA301005 130 30 FA IEC PAM + Input Shaft 110/112B5 4-5 Days €793.39
BGB130FA3013214 130 30 FA IEC PAM + Input Shaft 132B14 4-5 Days €793.39
BGB130FA301325 130 30 FA IEC PAM + Input Shaft 132B5 4-5 Days €793.39
BGB130FA4010014 130 40 FA IEC PAM + Input Shaft 110/112B14 4-5 Days €793.39
BGB130FA401005 130 40 FA IEC PAM + Input Shaft 110/112B5 4-5 Days €793.39
BGB130FA4013214 130 40 FA IEC PAM + Input Shaft 132B14 4-5 Days €793.39
BGB130FA401325 130 40 FA IEC PAM + Input Shaft 132B5 4-5 Days €793.39
BGB130FA5010014 130 50 FA IEC PAM + Input Shaft 110/112B14 4-5 Days €793.39
BGB130FA501005 130 50 FA IEC PAM + Input Shaft 110/112B5 4-5 Days €793.39
BGB130FA6010014 130 60 FA IEC PAM + Input Shaft 110/112B14 4-5 Days €793.39
BGB130FA601005 130 60 FA IEC PAM + Input Shaft 110/112B5 4-5 Days €793.39
BGB130FA7.513214 130 7.5 FA IEC PAM + Input Shaft 132B14 4-5 Days €793.39
BGB130FA7.51325 130 7.5 FA IEC PAM + Input Shaft 132B5 4-5 Days €793.39
BGB130FA8010014 130 80 FA IEC PAM + Input Shaft 110/112B14 4-5 Days €793.39
BGB130FA801005 130 80 FA IEC PAM + Input Shaft 110/112B5 4-5 Days €793.39
BGB130FA80905 130 80 FA IEC PAM + Input Shaft 90B5 4-5 Days €793.39
BGB1501001005 150 100 U IEC PAM + Input Shaft 110/112B5 4-5 Days €1,242.90
BGB150101605 150 10 U IEC PAM + Input Shaft 160B5 4-5 Days €1,242.90
BGB150151605 150 15 U IEC PAM + Input Shaft 160B5 4-5 Days €1,242.90
BGB150201605 150 20 U IEC PAM + Input Shaft 160B5 4-5 Days €1,242.90
BGB150251605 150 25 U IEC PAM + Input Shaft 160B5 4-5 Days €1,242.90
BGB150301325 150 30 U IEC PAM + Input Shaft 132B5 4-5 Days €1,242.90
BGB150401325 150 40 U IEC PAM + Input Shaft 132B5 4-5 Days €1,242.90
BGB150501325 150 50 U IEC PAM + Input Shaft 132B5 4-5 Days €1,242.90
BGB150601325 150 60 U IEC PAM + Input Shaft 132B5 4-5 Days €1,242.90
BGB1507.51605 150 7.5 U IEC PAM + Input Shaft 160B5 4-5 Days €1,242.90
BGB150801005 150 80 U IEC PAM + Input Shaft 110/112B5 4-5 Days €1,242.90
BGB150FA1001005 150 100 FA IEC PAM + Input Shaft 110/112B5 4-5 Days €1,319.07
BGB150FA101605 150 10 FA IEC PAM + Input Shaft 160B5 4-5 Days €1,319.07
BGB150FA151605 150 15 FA IEC PAM + Input Shaft 160B5 4-5 Days €1,319.07
BGB150FA201605 150 20 FA IEC PAM + Input Shaft 160B5 4-5 Days €1,319.07
BGB150FA251605 150 25 FA IEC PAM + Input Shaft 160B5 4-5 Days €1,319.07
BGB150FA301325 150 30 FA IEC PAM + Input Shaft 132B5 4-5 Days €1,319.07
BGB150FA401325 150 40 FA IEC PAM + Input Shaft 132B5 4-5 Days €1,319.07
BGB150FA501325 150 50 FA IEC PAM + Input Shaft 132B5 4-5 Days €1,319.07
BGB150FA601325 150 60 FA IEC PAM + Input Shaft 132B5 4-5 Days €1,319.07
BGB150FA7.51605 150 7.5 FA IEC PAM + Input Shaft 160B5 4-5 Days €1,319.07
BGB150FA801005 150 80 FA IEC PAM + Input Shaft 110/112B5 4-5 Days €1,319.07
BGB25105614 25 10 U IEC PAM + Input Shaft 56B14 4-5 Days €79.81
BGB25155614 25 15 U IEC PAM + Input Shaft 56B14 4-5 Days €79.81
BGB25205614 25 20 U IEC PAM + Input Shaft 56B14 4-5 Days €79.81
BGB25255614 25 25 U IEC PAM + Input Shaft 56B14 4-5 Days €79.81
BGB25305614 25 30 U IEC PAM + Input Shaft 56B14 4-5 Days €79.81
BGB25405614 25 40 U IEC PAM + Input Shaft 56B14 4-5 Days €79.81
BGB25505614 25 50 U IEC PAM + Input Shaft 56B14 4-5 Days €79.81
BGB25605614 25 60 U IEC PAM + Input Shaft 56B14 4-5 Days €79.81
BGB257.55614 25 7.5 U IEC PAM + Input Shaft 56B14 4-5 Days €79.81
BGB25FA105614 25 10 FA IEC PAM + Input Shaft 56B14 4-5 Days €86.11
BGB25FA155614 25 15 FA IEC PAM + Input Shaft 56B14 4-5 Days €86.11
BGB25FA205614 25 20 FA IEC PAM + Input Shaft 56B14 4-5 Days €86.11
BGB25FA255614 25 25 FA IEC PAM + Input Shaft 56B14 4-5 Days €86.11
BGB25FA305614 25 30 FA IEC PAM + Input Shaft 56B14 4-5 Days €86.11
BGB25FA405614 25 40 FA IEC PAM + Input Shaft 56B14 4-5 Days €86.11
BGB25FA505614 25 50 FA IEC PAM + Input Shaft 56B14 4-5 Days €86.11
BGB25FA605614 25 60 FA IEC PAM + Input Shaft 56B14 4-5 Days €86.11
BGB25FA7.55614 25 7.5 FA IEC PAM + Input Shaft 56B14 4-5 Days €86.11
BGB30105614 30 10 U IEC PAM + Input Shaft 56B14 4-5 Days €80.30
BGB3010565 30 10 U IEC PAM + Input Shaft 56B5 4-5 Days €80.30
BGB30106314 30 10 U IEC PAM + Input Shaft 63B14 4-5 Days €80.30
BGB3010635 30 10 U IEC PAM + Input Shaft 63B5 4-5 Days €80.30
BGB30155614 30 15 U IEC PAM + Input Shaft 56B14 4-5 Days €80.30
BGB3015565 30 15 U IEC PAM + Input Shaft 56B5 4-5 Days €80.30
BGB30156314 30 15 U IEC PAM + Input Shaft 63B14 4-5 Days €80.30
BGB3015635 30 15 U IEC PAM + Input Shaft 63B5 4-5 Days €80.30
BGB30205614 30 20 U IEC PAM + Input Shaft 56B14 4-5 Days €80.30
BGB3020565 30 20 U IEC PAM + Input Shaft 56B5 4-5 Days €80.30
BGB30206314 30 20 U IEC PAM + Input Shaft 63B14 4-5 Days €80.30
BGB3020635 30 20 U IEC PAM + Input Shaft 63B5 4-5 Days €80.30
BGB30255614 30 25 U IEC PAM + Input Shaft 56B14 4-5 Days €80.30
BGB3025565 30 25 U IEC PAM + Input Shaft 56B5 4-5 Days €80.30
BGB30256314 30 25 U IEC PAM + Input Shaft 63B14 4-5 Days €80.30
BGB3025635 30 25 U IEC PAM + Input Shaft 63B5 4-5 Days €80.30
BGB30305614 30 30 U IEC PAM + Input Shaft 56B14 4-5 Days €80.30
BGB3030565 30 30 U IEC PAM + Input Shaft 56B5 4-5 Days €80.30
BGB30306314 30 30 U IEC PAM + Input Shaft 63B14 4-5 Days €80.30
BGB3030635 30 30 U IEC PAM + Input Shaft 63B5 4-5 Days €80.30
BGB30405614 30 40 U IEC PAM + Input Shaft 56B14 4-5 Days €80.30
BGB3040565 30 40 U IEC PAM + Input Shaft 56B5 4-5 Days €80.30
BGB30406314 30 40 U IEC PAM + Input Shaft 63B14 4-5 Days €80.30
BGB3040635 30 40 U IEC PAM + Input Shaft 63B5 4-5 Days €80.30
BGB30505614 30 50 U IEC PAM + Input Shaft 56B14 4-5 Days €80.30
BGB3050565 30 50 U IEC PAM + Input Shaft 56B5 4-5 Days €80.30
BGB30506314 30 50 U IEC PAM + Input Shaft 63B14 4-5 Days €80.30
BGB3050635 30 50 U IEC PAM + Input Shaft 63B5 4-5 Days €80.30
BGB30605614 30 60 U IEC PAM + Input Shaft 56B14 4-5 Days €80.30
BGB3060565 30 60 U IEC PAM + Input Shaft 56B5 4-5 Days €80.30
BGB30606314 30 60 U IEC PAM + Input Shaft 63B14 4-5 Days €80.30
BGB3060635 30 60 U IEC PAM + Input Shaft 63B5 4-5 Days €80.30
BGB307.55614 30 7.5 U IEC PAM + Input Shaft 56B14 4-5 Days €80.30
BGB307.5565 30 7.5 U IEC PAM + Input Shaft 56B5 4-5 Days €80.30
BGB307.56314 30 7.5 U IEC PAM + Input Shaft 63B14 4-5 Days €80.30
BGB307.5635 30 7.5 U IEC PAM + Input Shaft 63B5 4-5 Days €80.30
BGB30805614 30 80 U IEC PAM + Input Shaft 56B14 4-5 Days €80.30
BGB3080565 30 80 U IEC PAM + Input Shaft 56B5 4-5 Days €80.30
BGB30FA105614 30 10 FA IEC PAM + Input Shaft 56B14 4-5 Days €87.04
BGB30FA10565 30 10 FA IEC PAM + Input Shaft 56B5 4-5 Days €87.04
BGB30FA106314 30 10 FA IEC PAM + Input Shaft 63B14 4-5 Days €87.04
BGB30FA10635 30 10 FA IEC PAM + Input Shaft 63B5 4-5 Days €87.04
BGB30FA155614 30 15 FA IEC PAM + Input Shaft 56B14 4-5 Days €87.04
BGB30FA15565 30 15 FA IEC PAM + Input Shaft 56B5 4-5 Days €87.04
BGB30FA156314 30 15 FA IEC PAM + Input Shaft 63B14 4-5 Days €87.04
BGB30FA15635 30 15 FA IEC PAM + Input Shaft 63B5 4-5 Days €87.04
BGB30FA205614 30 20 FA IEC PAM + Input Shaft 56B14 4-5 Days €87.04
BGB30FA20565 30 20 FA IEC PAM + Input Shaft 56B5 4-5 Days €87.04
BGB30FA206314 30 20 FA IEC PAM + Input Shaft 63B14 4-5 Days €87.04
BGB30FA20635 30 20 FA IEC PAM + Input Shaft 63B5 4-5 Days €87.04
BGB30FA255614 30 25 FA IEC PAM + Input Shaft 56B14 4-5 Days €87.04
BGB30FA25565 30 25 FA IEC PAM + Input Shaft 56B5 4-5 Days €87.04
BGB30FA256314 30 25 FA IEC PAM + Input Shaft 63B14 4-5 Days €87.04
BGB30FA25635 30 25 FA IEC PAM + Input Shaft 63B5 4-5 Days €87.04
BGB30FA305614 30 30 FA IEC PAM + Input Shaft 56B14 4-5 Days €87.04
BGB30FA30565 30 30 FA IEC PAM + Input Shaft 56B5 4-5 Days €87.04
BGB30FA306314 30 30 FA IEC PAM + Input Shaft 63B14 4-5 Days €87.04
BGB30FA30635 30 30 FA IEC PAM + Input Shaft 63B5 4-5 Days €87.04
BGB30FA405614 30 40 FA IEC PAM + Input Shaft 56B14 4-5 Days €87.04
BGB30FA40565 30 40 FA IEC PAM + Input Shaft 56B5 4-5 Days €87.04
BGB30FA406314 30 40 FA IEC PAM + Input Shaft 63B14 4-5 Days €87.04
BGB30FA40635 30 40 FA IEC PAM + Input Shaft 63B5 4-5 Days €87.04
BGB30FA505614 30 50 FA IEC PAM + Input Shaft 56B14 4-5 Days €87.04
BGB30FA50565 30 50 FA IEC PAM + Input Shaft 56B5 4-5 Days €87.04
BGB30FA506314 30 50 FA IEC PAM + Input Shaft 63B14 4-5 Days €87.04
BGB30FA50635 30 50 FA IEC PAM + Input Shaft 63B5 4-5 Days €87.04
BGB30FA605614 30 60 FA IEC PAM + Input Shaft 56B14 4-5 Days €87.04
BGB30FA60565 30 60 FA IEC PAM + Input Shaft 56B5 4-5 Days €87.04
BGB30FA606314 30 60 FA IEC PAM + Input Shaft 63B14 4-5 Days €87.04
BGB30FA60635 30 60 FA IEC PAM + Input Shaft 63B5 4-5 Days €87.04
BGB30FA7.55614 30 7.5 FA IEC PAM + Input Shaft 56B14 4-5 Days €87.04
BGB30FA7.5565 30 7.5 FA IEC PAM + Input Shaft 56B5 4-5 Days €87.04
BGB30FA7.56314 30 7.5 FA IEC PAM + Input Shaft 63B14 4-5 Days €87.04
BGB30FA7.5635 30 7.5 FA IEC PAM + Input Shaft 63B5 4-5 Days €87.04
BGB30FA805614 30 80 FA IEC PAM + Input Shaft 56B14 4-5 Days €87.04
BGB30FA80565 30 80 FA IEC PAM + Input Shaft 56B5 4-5 Days €87.04
BGB40100565 40 100 U IEC PAM + Input Shaft 63B5 4-5 Days €93.73
BGB401006314 40 100 U IEC PAM + Input Shaft 63B14 4-5 Days €93.73
BGB40100635 40 100 U IEC PAM + Input Shaft 63B5 4-5 Days €93.73
BGB40106314 40 10 U IEC PAM + Input Shaft 63B14 4-5 Days €93.73
BGB4010635 40 10 U IEC PAM + Input Shaft 63B5 4-5 Days €93.73
BGB40107114 40 10 U IEC PAM + Input Shaft 71B14 4-5 Days €93.73
BGB4010715 40 10 U IEC PAM + Input Shaft 71B5 4-5 Days €93.73
BGB40156314 40 15 U IEC PAM + Input Shaft 63B14 4-5 Days €93.73
BGB4015635 40 15 U IEC PAM + Input Shaft 63B5 4-5 Days €93.73
BGB40157114 40 15 U IEC PAM + Input Shaft 71B14 4-5 Days €93.73
BGB4015715 40 15 U IEC PAM + Input Shaft 71B5 4-5 Days €93.73
BGB40206314 40 20 U IEC PAM + Input Shaft 63B14 4-5 Days €93.73
BGB4020635 40 20 U IEC PAM + Input Shaft 63B5 4-5 Days €93.73
BGB40207114 40 20 U IEC PAM + Input Shaft 71B14 4-5 Days €93.73
BGB4020715 40 20 U IEC PAM + Input Shaft 71B5 4-5 Days €93.73
BGB40256314 40 25 U IEC PAM + Input Shaft 63B14 4-5 Days €93.73
BGB4025635 40 25 U IEC PAM + Input Shaft 63B5 4-5 Days €93.73
BGB40257114 40 25 U IEC PAM + Input Shaft 71B14 1-2 Days €93.73
BGB4025715 40 25 U IEC PAM + Input Shaft 71B5 1-2 Days €93.73
BGB40306314 40 30 U IEC PAM + Input Shaft 63B14 4-5 Days €93.73
BGB4030635 40 30 U IEC PAM + Input Shaft 63B5 4-5 Days €93.73
BGB40307114 40 30 U IEC PAM + Input Shaft 71B14 1-2 Days €93.73
BGB4030715 40 30 U IEC PAM + Input Shaft 71B5 1-2 Days €93.73
BGB40406314 40 40 U IEC PAM + Input Shaft 63B14 4-5 Days €93.73
BGB4040635 40 40 U IEC PAM + Input Shaft 63B5 4-5 Days €93.73
BGB40407114 40 40 U IEC PAM + Input Shaft 71B14 4-5 Days €93.73
BGB4040715 40 40 U IEC PAM + Input Shaft 71B5 4-5 Days €93.73
BGB4050565 40 50 U IEC PAM + Input Shaft 56B5 4-5 Days €93.73
BGB40506314 40 50 U IEC PAM + Input Shaft 63B14 4-5 Days €93.73
BGB4050635 40 50 U IEC PAM + Input Shaft 63B5 4-5 Days €93.73
BGB4060565 40 60 U IEC PAM + Input Shaft 56B5 4-5 Days €93.73
BGB40606314 40 60 U IEC PAM + Input Shaft 63B14 4-5 Days €93.73
BGB4060635 40 60 U IEC PAM + Input Shaft 63B5 4-5 Days €93.73
BGB407.56314 40 7.5 U IEC PAM + Input Shaft 63B14 4-5 Days €93.73
BGB407.5635 40 7.5 U IEC PAM + Input Shaft 63B5 4-5 Days €93.73
BGB407.57114 40 7.5 U IEC PAM + Input Shaft 71B14 1-2 Days €93.73
BGB407.5715 40 7.5 U IEC PAM + Input Shaft 71B5 1-2 Days €93.73
BGB4080565 40 80 U IEC PAM + Input Shaft 56B5 4-5 Days €93.73
BGB40806314 40 80 U IEC PAM + Input Shaft 63B14 4-5 Days €93.73
BGB4080635 40 80 U IEC PAM + Input Shaft 63B5 4-5 Days €93.73
BGB40FA100565 40 100 FA IEC PAM + Input Shaft 63B5 4-5 Days €101.42
BGB40FA1006314 40 100 FA IEC PAM + Input Shaft 63B14 4-5 Days €101.42
BGB40FA100635 40 100 FA IEC PAM + Input Shaft 63B5 4-5 Days €101.42
BGB40FA106314 40 10 FA IEC PAM + Input Shaft 63B14 4-5 Days €101.42
BGB40FA10635 40 10 FA IEC PAM + Input Shaft 63B5 4-5 Days €101.42
BGB40FA107114 40 10 FA IEC PAM + Input Shaft 71B14 4-5 Days €101.42
BGB40FA10715 40 10 FA IEC PAM + Input Shaft 71B5 4-5 Days €101.42
BGB40FA156314 40 15 FA IEC PAM + Input Shaft 63B14 4-5 Days €101.42
BGB40FA15635 40 15 FA IEC PAM + Input Shaft 63B5 4-5 Days €101.42
BGB40FA157114 40 15 FA IEC PAM + Input Shaft 71B14 4-5 Days €101.42
BGB40FA15715 40 15 FA IEC PAM + Input Shaft 71B5 4-5 Days €101.42
BGB40FA206314 40 20 FA IEC PAM + Input Shaft 63B14 4-5 Days €101.42
BGB40FA20635 40 20 FA IEC PAM + Input Shaft 63B5 4-5 Days €101.42
BGB40FA207114 40 20 FA IEC PAM + Input Shaft 71B14 4-5 Days €101.42
BGB40FA20715 40 20 FA IEC PAM + Input Shaft 71B5 4-5 Days €101.42
BGB40FA256314 40 25 FA IEC PAM + Input Shaft 63B14 4-5 Days €101.42
BGB40FA25635 40 25 FA IEC PAM + Input Shaft 63B5 4-5 Days €101.42
BGB40FA257114 40 25 FA IEC PAM + Input Shaft 71B14 1-2 Days €101.42
BGB40FA25715 40 25 FA IEC PAM + Input Shaft 71B5 1-2 Days €101.42
BGB40FA306314 40 30 FA IEC PAM + Input Shaft 63B14 4-5 Days €101.42
BGB40FA30635 40 30 FA IEC PAM + Input Shaft 63B5 4-5 Days €101.42
BGB40FA307114 40 30 FA IEC PAM + Input Shaft 71B14 1-2 Days €101.42
BGB40FA30715 40 30 FA IEC PAM + Input Shaft 71B5 1-2 Days €101.42
BGB40FA406314 40 40 FA IEC PAM + Input Shaft 63B14 4-5 Days €101.42
BGB40FA40635 40 40 FA IEC PAM + Input Shaft 63B5 4-5 Days €101.42
BGB40FA407114 40 40 FA IEC PAM + Input Shaft 71B14 4-5 Days €101.42
BGB40FA40715 40 40 FA IEC PAM + Input Shaft 71B5 4-5 Days €101.42
BGB40FA50565 40 50 FA IEC PAM + Input Shaft 56B5 4-5 Days €101.42
BGB40FA506314 40 50 FA IEC PAM + Input Shaft 63B14 4-5 Days €101.42
BGB40FA50635 40 50 FA IEC PAM + Input Shaft 63B5 4-5 Days €101.42
BGB40FA60565 40 60 FA IEC PAM + Input Shaft 56B5 4-5 Days €101.42
BGB40FA606314 40 60 FA IEC PAM + Input Shaft 63B14 4-5 Days €101.42
BGB40FA60635 40 60 FA IEC PAM + Input Shaft 63B5 4-5 Days €101.42
BGB40FA7.56314 40 7.5 FA IEC PAM + Input Shaft 63B14 4-5 Days €101.42
BGB40FA7.5635 40 7.5 FA IEC PAM + Input Shaft 63B5 4-5 Days €101.42
BGB40FA7.57114 40 7.5 FA IEC PAM + Input Shaft 71B14 1-2 Days €101.42
BGB40FA7.5715 40 7.5 FA IEC PAM + Input Shaft 71B5 1-2 Days €101.42
BGB40FA80565 40 80 FA IEC PAM + Input Shaft 56B5 4-5 Days €101.42
BGB40FA806314 40 80 FA IEC PAM + Input Shaft 63B14 4-5 Days €101.42
BGB40FA80635 40 80 FA IEC PAM + Input Shaft 63B5 4-5 Days €101.42
BGB40FB100565 40 100 FB IEC PAM + Input Shaft 63B5 4-5 Days €105.88
BGB40FB1006314 40 100 FB IEC PAM + Input Shaft 63B14 4-5 Days €105.88
BGB40FB100635 40 100 FB IEC PAM + Input Shaft 63B5 4-5 Days €105.88
BGB40FB106314 40 10 FB IEC PAM + Input Shaft 63B14 4-5 Days €105.88
BGB40FB10635 40 10 FB IEC PAM + Input Shaft 63B5 4-5 Days €105.88
BGB40FB107114 40 10 FB IEC PAM + Input Shaft 71B14 4-5 Days €105.88
BGB40FB10715 40 10 FB IEC PAM + Input Shaft 71B5 4-5 Days €105.88
BGB40FB156314 40 15 FB IEC PAM + Input Shaft 63B14 4-5 Days €105.88
BGB40FB15635 40 15 FB IEC PAM + Input Shaft 63B5 4-5 Days €105.88
BGB40FB157114 40 15 FB IEC PAM + Input Shaft 71B14 4-5 Days €105.88
BGB40FB15715 40 15 FB IEC PAM + Input Shaft 71B5 4-5 Days €105.88
BGB40FB206314 40 20 FB IEC PAM + Input Shaft 63B14 4-5 Days €105.88
BGB40FB20635 40 20 FB IEC PAM + Input Shaft 63B5 4-5 Days €105.88
BGB40FB207114 40 20 FB IEC PAM + Input Shaft 71B14 4-5 Days €105.88
BGB40FB20715 40 20 FB IEC PAM + Input Shaft 71B5 4-5 Days €105.88
BGB40FB256314 40 25 FB IEC PAM + Input Shaft 63B14 4-5 Days €105.88
BGB40FB25635 40 25 FB IEC PAM + Input Shaft 63B5 4-5 Days €105.88
BGB40FB257114 40 25 FB IEC PAM + Input Shaft 71B14 1-2 Days €105.88
BGB40FB25715 40 25 FB IEC PAM + Input Shaft 71B5 1-2 Days €105.88
BGB40FB306314 40 30 FB IEC PAM + Input Shaft 63B14 4-5 Days €105.88
BGB40FB30635 40 30 FB IEC PAM + Input Shaft 63B5 4-5 Days €105.88
BGB40FB307114 40 30 FB IEC PAM + Input Shaft 71B14 1-2 Days €105.88
BGB40FB30715 40 30 FB IEC PAM + Input Shaft 71B5 1-2 Days €105.88
BGB40FB406314 40 40 FB IEC PAM + Input Shaft 63B14 4-5 Days €105.88
BGB40FB40635 40 40 FB IEC PAM + Input Shaft 63B5 4-5 Days €105.88
BGB40FB407114 40 40 FB IEC PAM + Input Shaft 71B14 4-5 Days €105.88
BGB40FB40715 40 40 FB IEC PAM + Input Shaft 71B5 4-5 Days €105.88
BGB40FB50565 40 50 FB IEC PAM + Input Shaft 56B5 4-5 Days €105.88
BGB40FB506314 40 50 FB IEC PAM + Input Shaft 63B14 4-5 Days €105.88
BGB40FB50635 40 50 FB IEC PAM + Input Shaft 63B5 4-5 Days €105.88
BGB40FB60565 40 60 FB IEC PAM + Input Shaft 56B5 4-5 Days €105.88
BGB40FB606314 40 60 FB IEC PAM + Input Shaft 63B14 4-5 Days €105.88
BGB40FB60635 40 60 FB IEC PAM + Input Shaft 63B5 4-5 Days €105.88
BGB40FB7.56314 40 7.5 FB IEC PAM + Input Shaft 63B14 4-5 Days €105.88
BGB40FB7.5635 40 7.5